Before & After Gallery 
Masterwork used the wall space to create an accessible & serviceable pipe & pumping scheme
Masterwork used the wall space to create an accessible & serviceable pipe & pumping scheme

Wall space is simply wasted in this installation. Very poor wiring and the control was not correct for radiant heat.
Wall space is simply wasted in this installation. Very poor wiring and the control was not correct for radiant heat.

This two-boiler installation wasn't heating a beautiful log home near Breckenridge. Service and repair were nearly impossible!
This two-boiler installation wasn't heating a beautiful log home near Breckenridge. Service and repair were nearly impossible!

Triangle Prestige condensing boiler replaced two conventional cast iron boilers. The Prestige boiler is 90% efficient with EnergyStar Approval. Note we even painted the mechanical room walls to brighten up this space.
Triangle Prestige condensing boiler replaced two conventional cast iron boilers. The Prestige boiler is 90% efficient with EnergyStar Approval. Note we even painted the mechanical room walls to brighten up this space.

Heating Technician's Nightmare !
Heating Technician's Nightmare !

After boiler replacement and mechanical revision. This is how a well-designed system should look!
After boiler replacement and mechanical revision. This is how a well-designed system should look!

Leaks, poor design damaged boiler. Note two conventional water heaters -- operating at 65% efficiency.
Leaks, poor design damaged boiler. Note two conventional water heaters -- operating at 65% efficiency.

New Buderus cast iron boiler & piping design upgrade. Single new Triangle indirect water heater utilizing
84% boiler efficiency
New Buderus cast iron boiler & piping design upgrade. Single new Triangle indirect water heater utilizing
84% boiler efficiency

Poor soldering, joints leaking onto boiler
Poor soldering, joints leaking onto boiler

Better layout, boiler installation more serviceable; boiler on blocks for better access & service
Better layout, boiler installation more serviceable; boiler on blocks for better access & service

Old-school piping from boiler -- connected directly to radiant heat manifold
Old-school piping from boiler -- connected directly to radiant heat manifold

Modern primary/secondary piping -- radiant temperature variable, responding to outdoor temperature changes
Modern primary/secondary piping -- radiant temperature variable, responding to outdoor temperature changes

Powered by Gallery v1